Tags

,

Well ever since this summer we have been waiting for the City of Racine to take down the two what I call Zombie homes on my Block.

Myself I thought they (Zombie Homes) not come down due to how late in the year was getting when I last talked to the City the inspector had no idea when the take down would happen.

I, myself had no talked to the contractor doing the work + the time frame he gave me was already off so who knew?

The Talk down started today. More water/gas/sewer lines got dug up then cut they will be reburied.

Thinking Tuesday 12/2/14 the building will get taken down then the hole left be filled in with clean fill and Sod added in the Spring.

I hope to take and post photos as they do the work be interesting to see.

Advertisements